Astana · 2016
Full-cycle industrial complex: armoured systems, logistics, high-precision production lines.
Outcome
Paint and assembly envelope handed over; logistics and warehousing integrated.
Astana · 2016–2017
Power units for rail traction: wash-and-paint complexes and integrated process equipment.
Wash-paint lines commissioned; aligned with engine assembly technology.
Akzhal · 2015–2016
Heavy machinery production focused on protective coatings and serial finishing of large assemblies.
Industrial paint booths brought online; stable coating quality on serial parts.
Almaty Region · 2015
Modernisation of paint-prep infrastructure for agro-industrial manufacturing.
Surface prep and powder line commissioned without halting core output.
Karaganda · 2016
Aviation paint complex engineered for cleanliness and coating metrology.
Clean-zone requirements met; ready for coating qualification trials.
Almaty Region · 2017
Capacity expansion with a focus on equipment localisation.
Paint throughput increased; critical machining steps localised.
Khromtau · 2019
45-metre linear paint complex for oversized agricultural machinery.
Oversized paint line live; shortened pre-season preparation cycle.
Ekibastuz · 2024–2025
Machine-tool capacity for railcar manufacturing under compressed schedules.
Machining capacity expanded; assembly feed schedules maintained.
Mangystau, Turkistan, East Kazakhstan · 2017
Paint shop reconstruction for rolling stock refurbishment.
Car paint throughput restored; workshop downtime minimised.
Zhanatas · 2024–2025
Multi-format production: OEM-grade finishing for body and aggregate modules.
Paint flow and in-plant logistics aligned for multi-model output.
Almaty · 2024–2025
High-throughput paint capacity for multi-brand assembly.
Line flexibility for multiple brands without throughput loss.
Taraz · 2024–2025
Agro-processing industrial asset: design, construction, and turnkey handover.
Handover with as-built documentation; ready for industrial processing start-up.